System Operators (x 2 ) at TANESCO

Application Deadline: 30 Apr 2015
System Operators (x 2 ) POSITION DESCRIPTION:
From Daily News

INTERNAL AND EXTERNAL ADVERTISEMENT
Tanzania Electric Supply Company (TANESCO) is focusing on increasing the outreach and service quality of its Energy products for Tanzanians. Next to its current passion as a leading provider of electricity is to be more efficient, customer focused utility for Tanzania and beyond. The Company has the largest electricity generation, transmission and distribution network in Tanzania. In order to reach its goals, the Company is investing heavily in its generation, transmission and distribution network, its business systems and human capital. TANESCO now invites applicants who are self-motivated, honest, hardworking and committed individuals to fill the under-mentioned posts in Kagera Region.
Specific attributes for the Positions to be filled:
All Candidates must:
• Demonstrate impeccable performance track record.
• Demonstrate highest degree of integrity.
• Possess good communication and interpersonal skills.
• Be self-driven and capable of working with minimal supervision.
• Be capable of delivering excellent results while working under pressure with tight deadlines.
• Possess knowledge and competency in Information and Communication Technology (ICT) application.
• Professional skills in distribution management system.
• Problem solving skills.

POSITION; System Operators (x 2 )
Reports To: Sub Station Engineer- Shinyanga.
Reporting Office: Shinyanga.


POSITION OBJECTIVE:
Grid System monitoring to ensure that a continuous and reliable flow of electric power supply from generating plants to various places of grid destination and distribution points are maintained.

PRINCIPAL ACCOUNTABILITIES:
• Collects all necessary initial technical data in the daily log sheets and defect register book.
• Issue permits to work, limitation of access, sanction of test after proper Isolation of equipment at switch yard before people start working to ensure highest safety standards are observed and maintained all the times in order to preserve life and property.
• Maintains close liaison with Grid Control Centre (SCADA), Generating plants stations and other grid substation Operators to ensure smooth restoration of power supply in case of System power failure.
• Reports a day recorded shift events to System control Supervisor/In charge to ensure the higher authority get informed for record and action.
• Adheres safety procedures to ensure that, OSHA policy is strictly observed at work place.
• Observes plant operation to ensure that, electrical and electronics facilities for control, protection, metering data transfer and communication purposes are working properly.
• Carries out inspections to ensure that, all equipment inside control room and substation yards are safe and okay.
• Monitors plant operations to ensure that, electrical power is supplied to customers at the Company standards for voltage, frequency, current (load current) MW, MVAR, power factor etc.
• Monitors plant operations to ensure that, switching procedures is properly and carefully followed during system/plant operations. Any other official duties as may be assigned by the Senior Engineer.
• Any other official duties as may be assigned by the Sub Station Engineer

ACADEMIC QUALIFICATION AND EXPERIENCE:
• Form IV/VI Holder of FTC or Diploma in Electrical Engineering.
• Fresh candidate from recognized collage or above


REMUNERATION AND BENEFITS:
Competitive remuneration package shall be offered commensurate with skills and experience.
Details will be discussed at the interview; only people who fit the above criteria need apply.
APPLICATION INSTRUCTIONS:
Applicants should send a written application giving full details of previous work life history, qualifications and include two work references. Application closing date: 30th April 2015. Applications should be marked “Private and confidential” and addressed to:
REGIONAL MANAGER,
TANESCO
P. O. Box 3,
BUKOBA, Tanzania
System Operators (x 2 ) at TANESCO System Operators (x 2 ) at TANESCO Reviewed by ISSAH JUMA on Friday, April 17, 2015 Rating: 5

No comments:

Powered by Blogger.